north side renovation gallery

View towards the main entrance of the school, from the Commons area.

School logo set into the Commons floor.

Main entrance into the Commons, as seen from the walkover.

Full length of the Commons, as seen from main entrance.

Commons with view towards cafeteria, as seen from walkover.

Fine Arts Department trophy cases located in the Commons, just outside the entrance to the D (music) Hall.

The entrance to the music wing, as seen from the Commons. This used to be an outside entrance to the Gymnasium (notice sign over door).

The D (music) Hall, just outside the Band Office.

A partial view of the new Band Room. The only new music room, it is located just outside the old Receiving Area.

The Redskin Code, formerly located at the old front entrance of the school, is now in the Commons.

The new Science area, which used to be the 250 (music) hall, as seen from the circle. You would be looking through the old Choir room.

Our home for a number of years. The old Band room is now a science classroom (with windows). Notice that the poles are still there!

The old principal's office is now a lobby outside the Auditorium.

The Auditorium, as seen from stage right.

The Auditorium, as seen from house left.

The Auditorium, as seen from the balcony. The stage has been expanded, with a new orchestra pit/lift. New lighting, new sound, new seats.

A piece of the old Gym floor is mounted over the entrance of By Hey Arena.

One of the new scoreboards in the Arena.

By Hey Arena. The seating is pulled out when needed for games. The space saved can accomodate more PE classes.

Another view of the Arena, towards the lockerrooms.